Checking the plausibility of available hydrological studies and general hydrological and geological assessment for the planned privately financed 10 MW hydropower system of Prell, Albania
Country:
Albania
Project Period:
June 2012
Services Provided:
Assessment, Monitoring & Evaluation
- Plausibility check of hydrological studies and recommendations
Name of Staff involved and functions performed:
Project Manager: Dr. Hedi Feibel, detailed hydrological analysis and risk assessment
Name of Client:
Green for Growth Fund Southeast Europe
Name of Partner Organisation(s):
Hydroplan Green World AS
Description of the Project:
Services provided by Skat: in-depth hydrological analysis based on available hydrological data and studies, data evaluation, establishment of rating curves, duration curves and calculation of residual flow.
Objective: plausibility check of available studies and evaluation of available data and risk assessment as a basis for the planning and design of the 10 MW hydropower system Prell
Activities: overview on and assessment of the various available hydrological studies, assessment of reliability of data for 2 gauging stations, establishment of flow duration curves, risk assessment, calculation of residual flow
Results: reliable hydrological study with risk assessment and determination of residual flow as a sound basis for the planning and detailed design of the 10 MW hydropower system of Prell