(edited)

Albania
June 2012
Green for Growth Fund Southeast Europe
Consultancy
Hydroplan Green World AS
Checking the plausibility of available hydrological studies and general hydrological and geological assessment for the planned privately financed 10 MW hydropower system of Prell, Albania
Services provided by Skat: in-depth hydrological analysis based on available hydrological data and studies, data evaluation, establishment of rating curves, duration curves and calculation of residual flow
Objective: plausibility check of available studies and evaluation of available data and risk assessment as a basis for the planning and design of the 10 MW hydropower system Prell
Activities: overview on and assessment of the various available hydrological studies, assessment of reliability of data for 2 gauging stations, establishment of flow duration curves, risk assessment, calculation of residual flow
Results: reliable hydrological study with risk assessment and determination of residual flow as a sound basis for the planning and detailed design of the 10 MW hydropower system of Prell