Detailed study for the 240 kW mini hydropower site Sahandaso (Amoron’i Mania Region) and update of two feasibility studies based on newly collected hydrological data

In the context of the implementation of Madagascar’s New Energy Policy, the Ministry of Water, Energy and Hydrocarbons and the Agency for the Development of Rural Electrification (ADER) in partnership with GIZ-PERER (Electrification Project through Renewables) intend to accelerate the process by supporting the elaboration of feasibility studies and detailed design studies before starting a “call for projects”. Skat was mandated to elaborate such studies as a basis for the rural electrification based on renewables.

.

Country:

Madagascar, Upper Matsiatra Region, Antsinanana and Amoron’i Mania


Project Period:

06.2019 – 01.2020


Services Provided:

Elaboration of mini hydropower studies for rural electrification: detailed design for Sahandaso (240 kW) and update of two mini hydro feasibility studies (120 kW and 135 kW) based on new hydrological data.


Name of Client(s)

GIZ, Deutsche Gesellschaft für Internationale Zusammenarbeit


Name of Partner Organisation(s) :

Hydro Engineering Ltd.


Name of Staff involved and functions performed:

Hedi Feibel as project leader and hydrologist, Peter Eichenberger as civil and hydraulic engineer, Martin Bölli as electrical engineer, Daniel Figi as geologist, Pascal Augareils, Toniniaina Rakotozanakajy, Paul Rakotondralambo, Rado Zilia, Solomahefa A.

Description of the Project:

Objective: Elaboration of detailed design (Sahandaso) and update of two feasibility studies (Ivato Centre and Ambatotoa) as sound basis for ADER to attract investors and thus to advance in rural electrification.

Services provided by Skat: one-year hydrological measurement campaign at all 3 sites and data analysis; Sahandaso: detailed technical design (civil works, electromechanical equipment, network) and specifications (including drawings), detailed geotechnical analysis, establish BoQ, cost estimate and financial and economic analysis. Update of feasibility studies for 2 other sites based on hydrological data.

Activities: hydrological data analysis; site surveys to collect detailed data & information; detailed technical design (civil structures and electromechanical equipment, network for 11 villages etc.), accurate cost and financial analysis.

Results: detailed design and two updated feasibility studies presenting feasible, sustainable and profitable options to make use of the hydropower potential for rural electrification and to provide required information to interested investors.